3500 acres of irrigation canals maintenance work starts

Western Thrace
Tue, 30 Apr 2024 9:26 GMT
Maintenance and repair works have started on the water channel in Kuruçay, located within the borders of Yassıköy Municipality, which was built in 1957 and was severely damaged by flooding in 2018.
3500 acres of irrigation canals maintenance work starts

It was stated that 3 thousand 500 decares of land in Yassıköy, Yalanca and Kara Musa were irrigated in the work initiated by the Eastern Macedonia - Thrace Region Presidency.

Rıdvan Hacı Mehmet, Vice President of the Eastern Macedonia - Thrace Region, made the following statements in his post on the subject: "The repair of the irrigation canals built in 1957 has started.
In 2018, it was severely damaged and not repaired. The previous state administration was insensitive to the problem and our farmers were left to their fate. With the initiatives of our state method, work has started to repair the canals serving 3500 acres of land in Yassıköy, Yalanca and Kara Musa villages. We wish good luck to our farmers and the people of the region."

Related News

MILLET MEDIA OE.
BİLAL BUDUR & CENGİZ ÖMER KOLLEKTİF ŞİRKETİ.
Address: Miaouli 7-9, Xanthi 67100, GREECE.
Tel: +30 25410 77968.
Email: info@milletgazetesi.gr.